Inside the Factory

Production, assembly, quality control, packing and container loading — filmed on our floor.

Production floor
Production floor
Finished reformers in the workshop
Workshop
Assembly line
Assembly
Packed units ready for export
Packed for export
Loading containers
Loading
Production line
Production line

Quality control at every step

  • Incoming material inspection — wood, aluminium, leather and springs
  • Frame welding and load testing
  • Spring tension and carriage-smoothness checks
  • Pre-shipment inspection and wooden-box packing

Capacity

Our partner lines can produce several hundred units per month for high-demand models. Stock items ship in 7–15 working days; customised orders in 25–35 working days.

Book a factory tour