Factory News
What is changing on the floor — springs, loading plans, lead times.
2026-11-06
Spring testing: every set is now matched by measured rate
Five-spring sets are now matched by measured resistance instead of nominal size, so each stack feels consistent.
Read →2026-10-30
40HQ to Rotterdam: 42 reformers, 39.6 kg freight per unit
A mixed load of TM-04 and TM-05 reformers shipped this week — here is the loading plan and the real freight maths.
Read →2026-10-24
Folding line expanded: oak and aluminium now share one cell
Oak and aluminium folding reformers are now assembled in the same cell, which shortens changeover and improves consistency.
Read →